Answer:
(24, 224 ) i.e. 24 basketball and 224 footballs
Step-by-step explanation:
<em>Basketball :</em>
uses 4 ounces of foam
20 minutes of labor
profit = $2.50
<em>Football :</em>
uses 3 ounces of foam
30 minutes of labor
profit = $2
Manufacturer has :
768 ounces of foam , 120 labor hours per week,
<u>using the simplex method to determine the optimal production schedule so as to maximize profits </u>
lets assume
x = number of basketball
y = number of footballs
maximize = 2.5 x + 2y from a linear programming problem
attached below is the detailed solution
Answer:
A) Akash (1.5m), Meera (1.52), Rahul (1.54m), Lakshmi (1.56m)
B) Lakshmi is the tallest, 1.56m tall
Step-by-step explanation:
Rahul- 1.54m
Akash- 1500mm
Meera- 152cm
Lakshmi- 1560mm
Let's start by converting all the measurements to meters.
Rahul is already in meters, so he can just stay the same.
1500mm = 1.5m
152cm = 1.52m
1560mm = 1.56m
So our new measurements are:
Rahul- 1.54m
Akash- 1.5m
Meera= 1.52m
Lakshmi= 1.56m
We can now make our conclusions.
A) Akash (1.5m), Meera (1.52), Rahul (1.54m), Lakshmi (1.56m)
B) Lakshmi is the tallest, 1.56m tall
Answer:
y = 20
Step-by-step explanation:
The problem states that y = 12 when x = 36. 36/12 is 3. This means that y is a third of what x is. This would mean that if x = 60, y would be a third of 60 which is 20 since 60/3 is 20.
Answer:
3 / 13
Step-by-step explanation:
Hello!
There are 52 cards in a deck with half being red and half being black. The question ask for when a black card is drawn so we divide the total by 2
52/ 2 = 26
There are 6 black face cards in a deck so to get the probability one will be drawn we put how many there are over the total amount
6/26 we can simplify this
3 / 13
The answer is 3 / 13
Hope this helps!