It would be $9 per hour all you have to do is divide 54 by 6 you get 9, unit rate is 1
I hope this helps
Answer:
9.625 gallons will be used by the painters in 3.5 hours
Step-by-step explanation:
2.75 gallons = 1 hr
X gallons = 3.5 hrs
X = (3.5 × 2.75)/1
X = 9.625 gallons
9.625 gallons will be used by the painters in 3.5 hours
Answer:
y= -2x -8
Step-by-step explanation:
I will be writing the equation of the perpendicular bisector in the slope-intercept form which is y=mx +c, where m is the gradient and c is the y-intercept.
A perpendicular bisector is a line that cuts through the other line perpendicularly (at 90°) and into 2 equal parts (and thus passes through the midpoint of the line).
Let's find the gradient of the given line.

Gradient of given line




The product of the gradients of 2 perpendicular lines is -1.
(½)(gradient of perpendicular bisector)= -1
Gradient of perpendicular bisector
= -1 ÷(½)
= -1(2)
= -2
Substitute m= -2 into the equation:
y= -2x +c
To find the value of c, we need to substitute a pair of coordinates that the line passes through into the equation. Since the perpendicular bisector passes through the midpoint of the given line, let's find the coordinates of the midpoint.

Midpoint of given line



Substituting (-3, -2) into the equation:
-2= -2(-3) +c
-2= 6 +c
c= -2 -6 <em>(</em><em>-</em><em>6</em><em> </em><em>on both</em><em> </em><em>sides</em><em>)</em>
c= -8
Thus, the equation of the perpendicular bisector is y= -2x -8.
Step-by-step explanation:
- if you want to round off to the nearest tenth, you need to change the last unit. so it become to 2 720 130
Answer:
40:1
Step-by-step explanation: