Let's look at work rates per minute.
Together they can paint the wall in x minutes.
Working together, in 1 minute, they do 1/x of the job.
The student who paints the wall in 16 minutes does 1/16 of the job in 1 minute.
The student who paints the wall in 24 minutes does 1/24 of the job in 1 minute.
Together, they do 1/16 + 1/24 of the job in 1 minute, but from above, we see that together, they do 1/x of the job in 1 minute, so 1/16 + 1/24 must equal 1/x. That gives us our equation.
1/16 + 1/24 = 1/x
1/16 * 3/3 + 1/24 * 2/2 = 1/x
3/48 + 2/48 = 1/x
5/48 = 1/x
x = 48/5 = 9.6
Answer: It takes them 9.6 minutes, or about 10 minutes to do the job together.
Divide the price by the quantity:
Bananas = 5.40 / 6 = 0.90 each
Oranges = 2.56/8 = 0.32 each
Apples = 4.68 / 12 = 0.39 each
Mangos = 3.16 / 4 = 0.79 each
Oranges have the lowest price each so are the best buy.
Answer:
3x + 7
Step-by-step explanation:
Answer:
Part 1: 31x+25=180
part 2: x=5
Step-by-step explanation:
there are 180° on a straight line, which is the base/ bottom line of the traingle (indicated by the arrow on the end).
so, 180-151= 29
29° is the third angle on the traingle.
now, there are 180° in a triangle, therefore to find an equation for x:
29+20x-3+11x-1= 180 (adding up all the angles and making it equal to 180°)
now simplify this equation to get:
31x+25=180 (PART 1)
to find x simply solve the equation:
31x=180-25
31x= 155
x= 155/31
x=5 (PART 2)
I. H o p e It. R I g h t.
(x - 9) (x-3)