Answer
given,
firm is producing = 2,475 units
output by hiring 50 workers W = $20 per hour
25 units of capital R = $10 per hour
marginal product of labor = 40
marginal product of capital = 25





Firm is not minimizing the cost because the firm use more capital and less labor.
the enclosed may help. earth rotes and you and i are fixed to it. air flows it's own path ...
Answer:
<em>20.08 Volts</em>
Explanation:
<u>Parallel Connection of Capacitors</u>
The voltage across any two elements connected in parallel is the same. If the elements are capacitors, then each voltage is


They are both the same after connecting them, thus

Or, equivalently

The total charge of both capacitors is

We can compute the total charge by using the initial conditions where both capacitors were disconnected:

Now we compute Q1 from the equation above

The final voltage of any of the capacitors is

Answer:
<h2>45.68 g</h2>
Explanation:
Given 45.678 g, converting the value to 4 digits is similar to converting the decimal number to 4 significant figure. We can see that the decimal number initially contains 5 numbers. To covert to a 4 digits number we will convert the last digit which is 8 to 0 because 0 is insignificant.
If the number we are converting to zero is more than 4 then the preceding number (7) will be rounded up by adding 1 to it
The decimal number will become 45.68.
Note that the value of 7 was rounded up to 8 since the value we are converting to zero is more than 4.
<em>Hence the decimal value in 4 digits is 45.68 g</em>