1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
antiseptic1488 [7]
2 years ago
6

The number m of miles a long-distance cyclist travels during today's ride can be modeled by the function m(t)=11t+55, where t re

presents the number of hours since a noon rest stop.
b. Interpret the slope and y-intercept
c. The cyclist can only ride until 6:00 PM. Identify the domain and range of the function.
Mathematics
1 answer:
iVinArrow [24]2 years ago
7 0

Step-by-step explanation:

m(t) = 11t + 55

the slope is always the factor of the variable, so here the slope is 11.

since t is the number of hours riding (after the noon rest stop), the slope (11) is actually the mean speed the rider is going (after the noon rest stop) : with every hour riding the cyclist goes another 11 miles, so this speed is 11 mph.

the y-intercept is the m value when t = 0, because here in our example y (the result variable) is renamed m.

it is here 55.

t = 0 means no time riding yet, so 55 is the "starting value" of the function. that means that the cyclist traveled already 55 miles earlier that day before the noon rest stop.

the cyclist can only ride until 6pm. but we don't know how long the noon rest stop is (i.e. when he continues riding after the rest stop).

so I need to make some assumptions :

the mean speed (11 mph) after lunch break, and the y-intercept (55) suggest to me that the cyclist was riding 5 hours before the stop (5×11 = 55), and will also ride 5 hours after the stop (= from 1pm to 6pm).

if this is wrong, and the cyclist starts at e.g. 12pm, then please just adjust the following numbers accordingly.

but here again, I am assuming the cyclist will go from 1pm to 6pm (for 5 hours).

the domain is the interval or set of all valid values of the input variable (here t) : all real numbers in [0 .. 5].

the "timer" starts at 0 right at the end of the noon test stop. and then the cyclist can go max. 5 hours. and I assume any part of an hour is valid, so we use real numbers instead of e.g. whole numbers.

the range is the interval or set of all valid values of the result variable (here m) : all real numbers in [55 .. 110].

for t = 0 we have m = 55. and this goes continuously up with t until t = 5, leading to 11×5 + 55 = 55+55 = 110.

You might be interested in
Use the Distributive Property to determine which of the following statements is equivalent to 3(4-2).
kobusy [5.1K]

Answer:

12-6

Step-by-step explanation:

You multiply 3 by the number on the inside. 3x4= 12. 3x2=6.

7 0
3 years ago
Evaluate (Two-fifths) cubed. Check all that apply.
Daniel [21]

Answer:

B.The expanded form is (Two-fifths) (two-fifths) (two-fifths).

E.Two-fifths)cubed = StartFraction 8 Over 125 EndFraction

5 0
3 years ago
Read 2 more answers
Find the discount on a $15 T-shirt. It is on sale for 10% off.
Lelu [443]

Answer:

$13.50 (discount price)

$1.50 (discount amount)

Step-by-step explanation:

$15 x 10% =

$15 x 0.1 = $1.50

$15 - $1.50 = $13.50

3 0
3 years ago
Read 2 more answers
Solve for X.<br><br> 2<br> 5<br> 25<br> 75
shtirl [24]
I don’t know honestly
5 0
3 years ago
Read 2 more answers
Help meh pls (problem below)
Masja [62]

Answer:

44 hours

Step-by-step explanation:

Topic of this question: Creating and Solving Equations, Rates, and Proportions

<h2>Method 1: Creating and Solving Equations</h2>

Step 1: Find the amount drilled per hour

To do this, we have to divide the amount drilled by the number of hours it took to drill and find how much is being drilled per hour.

(I know it's a mouthful)

-72ft = 24x, where x is the amount drilled per hour

-72ft ÷ 24 = x

-3ft = x

-3ft per hour

Step 2: Find how many hours it takes to drill to -132 ft

Since we know the rate of drilling per hour, we can divide the target amount by the amount drilled per hour

-132 ÷ -3 = y, where y is the number of hours it takes

44 = y

y = 44

It will take a total of 44 hours to drill to -132 ft

<h2>Method 2: Proportions</h2>

We can set up a proportion like this, where we know that it takes 24 hours to drill 72 ft, but we don't know how long it takes to drill 132 feet

\frac{-72}{24} = \frac{-132}x

Cross multiply

-72x = 24 * -132

Simplify

-72x = -3168\\

Divide both sides by -72

x = -3,168/-72

x = 44

It will take a total of 44 hours to dig to -132 ft

-Chetan K

8 0
3 years ago
Read 2 more answers
Other questions:
  • Evaluate.
    11·1 answer
  • Under which conditions do you expect helium gas to deviate most from ideal behavior?
    7·2 answers
  • Make w the subject of the formula!!!!! HELP!!!!<br><br> y=3w-a
    10·1 answer
  • Which set of numbers is ordered from least to greatest?
    5·1 answer
  • A particular computer takes 12 minutes to download a 36​-minute TV show. How long will it take the computer to download a 2​-hou
    14·1 answer
  • The equation y = 700x + 800 models the typical annual cost, y, in dollars, of medical expenses x years after a person’s 20th bir
    14·1 answer
  • In the figure below, ‖hl and ‖jk. Find the values of z and y.
    10·1 answer
  • PLEASE ANSWER ASAP !!! WILL GIVE BRAINLIEST
    6·1 answer
  • PLEASE LOOK AT PHOTO! WHOEVER ANSWERS CORRECTLY I WILL MARK BRAINIEST!!
    6·2 answers
  • An airplane is landing at Memphis International Airport. The airplane is currently flying at a height of 13,000 feet. The airpla
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!