Answer:
27.4
Step-by-step explanation:
First multiply the numerator and denominator by 10
Then write the problem in long division format
Then divide 52 by 19 and get 2
Then multiply the quotient digit (2) by the divisor 19
Then subtract 38 from 52
Then bring down the next number of the dividend
Then divide 140 by 19 to get 7
Then multiply the quotient digit (7) by the divisor 19
Then subtract 133 from 140
Then add a decimal point to the solution
Then bring down the next number of the dividend
Then divide 76 by 19 to get 4
Then multiply the quotient digit (4) by the divisor 19
Then subtract 76 from 76
The solution for long division for 52.06./1.9 is 27.4
27.4
Answer:
828.7 hours.
Step-by-step explanation:
To answer a question in which the total time has to be calculated of all the activities, first of all, all the times have to be converted to a single form. There are two types: decimals and fractions. Convert the fractions into decimals.
Department A = 202.50 hours.
Department B = 212 3⁄4 hours = 212.75 hours.
Department C = 198.25 hours.
Department D = 215 1⁄5 hours = 215.20 hours.
Therefore, the total number of hours spent on this project by all four departments. is the sum of all the above numbers. 202.50 hours + 212.75 hours + 198.25 hours + 215.20 hours = 828.7 hours.
Therefore, the total time is 828.7 hours!!!
1. Set up the long addition.
2 4 7
+3 5 8
_______
2. Calculate 7+8, which is 15.
since 15 is two-digit, we carry the first digit 1 to the next column.
1
2 4 7
+ 3 5 8
________
5
3. Calculate 4+5, which is 9. Now add the carry digit of 1, which is 10. Since 10 is two-digit, we carry the first digit 1 to the next column.
1 1
2 4 7
+ 3 5 8
________
0 5
4. Calculate 2+3, which is 5. Now add the carry digit of 1, which is 6.
1 1
2 4 7
+3 5 8
______
6 0 5
5. Therefore, 247 + 358 = 605.
605
Answer:
100 if rounded to hundreds
140 if rounded to tens
Step-by-step explanation: