Answer:
$984,000
Explanation:
The computation of the budgeted total manufacturing cost is shown below:
Budgeted total manufacturing costs in March = Fixed cost + Variable cost
= $24,000 + ($16 × 60,000)
= $24,000 + $960,000
= $984,000
We simply added the fixed cost and the variable cost in order to find out the budgeted total manufacturing cost
Answer: unilateral contract
Explanation:
An unilateral contract is a contact that is formed when an individual offers to do a particular thing in return for either money or something else that was agreed on.
Once such individual does that thing, he or she has to be given what was agreed on in the contract. A typical example is the contact regarding an insurance policy.
Therefore, an offer that can only be accepted by an offere's performance will create a unilateral contact.
Answer:
14%
Explanation:
required rate of return = risk free rate of return + ( risk premium x beta)
5% + 1.5 x 6% = 14%
Answer:
Fixed cost in an organization does not change and is fixed while the variable cost keep changing if the production is increased.
Explanation:
Fixed cost are said to be that cost which does not change with production level for a certain limit. Let us suppose there is no change in the rent amount if we have only factory for the production of goods.
But the variable cost are those cost which increases as production increases. More will be the variable cost when the production will be more. Also for per unit basis, the variable cost remains the same.
Fixed cost are not important in decision making if there is an excess of capacity available.
For example,
Direct labor, direct material -- variable cost
Salary of supervisor, rent of factory -- fixed cost
Even though there is not much change in the variable cost, like for suppose material price increases, a company can still make a budget that is based on the past experience and predicting the market prices. Similarly, if there is a machine that uses three units of direct material for a piece if finished product, which is not going to change in the future. Thus the company can make a budget.
Answer:
E. the more of something we produce, the greater is the opportunity cost of producing an additional unit
Explanation:
Opportunity cost is the cost of the next best option forgone when one alternative is chosen over other alternatives.
An example to illustrate increasing opportunity cost. Let us assume that Emily can use her leisure time to either rest or make spaghetti. If Emily uses 1 hour to make spaghetti, she forgoes 1 hour that she could have spent resting. If she spends 2 hours making spaghetti, she forgoes two hours of rest. Her opportunity cost keeps increasing the longer she spends making spaghetti.
I hope my answer helps you