<span> Ok, so slope of the lane gives the ball a constant acceleration of 1.8 m/s for 2.5 s
[lane slope = arcsine (1.8/9.8) = 10.6°]
which increases speed of the ball by
1.8(2.5) = 4.5 m/s
The ball reaches the pins with a speed = 7.6 m/s, so it must have left Josh's hand with a speed of
7.6 - 4.5 = 3.1 m/s ANS</span>
Answer:
Missing 0.4 what you need is 8.4
Explanation:
Answer:
it has overly melted due to the heat
Explanation:
Explanation:
Below is an attachment containing the solution.