1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
inn [45]
2 years ago
13

There are 120 people at a party 1/3 of the people leave the party work out the number of people still at the party

Mathematics
1 answer:
zvonat [6]2 years ago
8 0

Answer:

There is 80 people still at the party

Step-by-step explanation:

To find how many people are still at the party we first have to find how much 1/3 of 120 is.

∴120/3=40

then we subtract 1/3 of 120 from 120 to get the answer

∴120-40=80

You might be interested in
Everbank Field, home of the Jacksonville Jaguars, is capable of seating 76,867 fans. The revenue for a particular game can be mo
k0ka [10]
The total revenue for the event would the total amount earned from the tickets sold. So if x people attended the event, then there would be $(161x). We must keep in mind though the the maximum seating is 76 876. That means that the maximum revenue that can be earned must not exceed $(161)(76 867) = . Hence we have f(x) = 161x where 0 ≤ x ≤ 76867. From this, we can see that the domain is [0, 76867] while range is [0, 12375587]<span>.</span>
6 0
3 years ago
Identify the constant term in this expression 7p - 3p + 9 + x
ANEK [815]

Answer:

the constant in this expression is 9 because it is not a coefficient of any variable

7 0
3 years ago
Read 2 more answers
The production cost, represented by y, of smart phone devices are equal to the product of computing components (a) and the squar
Marta_Voda [28]

The production cost is an illustration of a quadratic function

<h3>How to determine the equation</h3>

We have the following parameters:

  • Computing components (a)
  • Number of devices (x),
  • Labor (b)
  • Savings on reusable material (c)

Using the instructions in the question, the equation of the production cost would be:

y =ax^2 + bx -c

Hence, the production cost is y =ax^2 + bx -c

<h3>Change the subject of the equation</h3>

In (a), we have:

y =ax^2 + bx -c

Subtract bx - c from both sides

y - bx + c = ax^2

Divide through by x^2

a = \frac{y - bx + c}{x^2}

Hence, the equation that represents the computing component is a = \frac{y - bx + c}{x^2}

Read more about equations and functions at:

brainly.com/question/1214333

3 0
3 years ago
Read 2 more answers
Can someone tell me what is 9x46288
Bad White [126]
Answer: 416,592

Hope this helps!
4 0
2 years ago
Robert is writing a paper for language arts class. He can write 2/3 of a page in 1/4 of an hour. At what rate is Robert writing?
Irina-Kira [14]

Answer:

A) 2 2/3 pages per hour

Step-by-step explanation:

You would multiply 1/4 times 4 to get 1 hour

then you would multiply 2/3 times 4 which is 2 2/3

6 0
3 years ago
Other questions:
  • (08.05)theresa earned scores of 88 points, 84 points, 88 points, and 91 points on four tests. what is the lowest score she can g
    6·1 answer
  • Which fraction is bigger 5/8 or 11/20
    14·2 answers
  • 25. what is happening in the diagram (5 points)
    9·2 answers
  • Information about movie ticket sales was printed in a movie magazine. in a sample of of fifty pg-rated movies, 36% had ticket sa
    5·1 answer
  • How do I find the area and perimeter for this
    8·1 answer
  • Point X is the incenter of ΔABC.
    8·2 answers
  • Prove that any number raised to the 0'th power equals 1
    6·1 answer
  • Please help fast !! <br> 50 points !
    15·2 answers
  • Choose the graph of line that has a slope of<br> 1/10 and passes through the point (0,7)
    13·2 answers
  • I need to know the answer and how to solve this
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!