Answer:
The Supersmack gum has a volume of
cm^3 or
cm^3. So, Supersmack's cylindrical bubble gum has more actual gum than the Megapop gumball
Step-by-step explanation:
Assuming that the radius of the Megapop gumball is 1.5 (the same diameter as Supersmack)
The volume of the cylinder's equation can be written as

This simplifies to
cm^3 or
cm^3
The volume of the gumball's equation can be written as

This simplifies to
cm^3 or
cm^3
The Supersmack gum has a volume of
cm^3 or
cm^3. So, Supersmack's cylindrical bubble gum has more actual gum than the Megapop gumball
Answer:
3 days
Step-by-step explanation:
This can be seen under Schedule management (Initiating)
Project float is simply the difference between the completion period externally imposed and the estimated time duration of the project (usually this is equal to the critical path length). The difference in this case is 0 because
Externally imposed project date = 75 days
Estimated duration of project = 75 days
Hence, a difference in these will be 0
However, a standard deviation of 3 days was giving (This implies that there is a +/- 3 days in the critical path from the estimated project duration)
.
Hence the maximum float in this case will be 0 + 3 = 3 days
350 dollars for the kayak + 1.50 for the fee + the 10.23 interest for the three months = 361.73
Answer:
Q
Step-by-step explanation:
X has constant value
x'-x = 0
m =(y'-y)/(x'-x) --> undefined

I think the correct answer is
D.
the product of x and a factor depending on x
SORRY if I am wrong.