1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
lord [1]
3 years ago
13

Please help me plssssssssssssssssssssss

Mathematics
2 answers:
oksian1 [2.3K]3 years ago
7 0

Problem 7

(45 pages)/(90 min) = 1/2 page per min, i.e. 1 page per 2 minutes

(60 pages)(120 min) = 1/2 page per min

Both lead to the same result, so yes they are proportional.

Their reading speed is identical.

<h3>Answer: True</h3>

andreev551 [17]3 years ago
7 0

\huge{\textbf{\textsf{{\color{navy}{An}}{\red{sw}}{\orange{er}} {\color{yellow}{:}}}}}

<h2>True</h2>

  • Thanks
  • Hope it helps

You might be interested in
Please help this is due??<br> I will give brainliest
iren [92.7K]

Answer:

The Supersmack gum has a volume of V=6.75\pi cm^3 or V=21.2057 cm^3. So, Supersmack's cylindrical bubble gum has more actual gum than the Megapop gumball

Step-by-step explanation:

Assuming that the radius of the Megapop gumball is 1.5 (the same diameter as Supersmack)

The volume of the cylinder's equation can be written as

V=\pi (1.5^{2})(3 )

This simplifies to

V=6.75\pi cm^3 or V=21.2057 cm^3

The volume of the gumball's equation can be written as

V=\frac{4}{3} \pi (1.5)^{3}

This simplifies to

v=4.5\pi cm^3 or V=14.1371 cm^3

The Supersmack gum has a volume of V=6.75\pi cm^3 or V=21.2057 cm^3. So, Supersmack's cylindrical bubble gum has more actual gum than the Megapop gumball

4 0
3 years ago
An externally imposed project completion time sets the project duration at 75 days. The critical path of the project is establis
Katen [24]

Answer:

3 days

Step-by-step explanation:

This can be seen under Schedule management (Initiating)

Project float is simply the difference between the completion period externally imposed and the estimated time duration of the project (usually this is equal to the critical path length). The difference in this case is 0 because

Externally imposed project date = 75 days

Estimated duration of project = 75 days

Hence, a difference in these will be 0

However, a standard deviation of 3 days was giving (This implies that there is a +/- 3 days in the critical path from the estimated project duration) .

Hence the maximum float in this case will be 0 + 3 = 3 days

8 0
4 years ago
How to solve this kind of question? <br><br><br> Show steps!
melomori [17]
350 dollars for the kayak + 1.50 for the fee + the 10.23 interest for the three months = 361.73
7 0
3 years ago
Which line on the graph below has an undefined slope?<br><br> P<br> Q<br> R<br> S
Bezzdna [24]

Answer:

Q

Step-by-step explanation:

X has constant value

x'-x = 0

m =(y'-y)/(x'-x)  --> undefined

3 0
3 years ago
Read 2 more answers
Select the correct verbal description for the expression below.
Alexxandr [17]
HEY THERE!!

I think the correct answer is
D.
the product of x and a factor depending on x

SORRY if I am wrong.
4 0
3 years ago
Read 2 more answers
Other questions:
  • I need help with this question ASAP.
    14·1 answer
  • Which of the following represents x =1/2 y written in general form?
    9·2 answers
  • Please help<br><br> Evaluate the expression for n=2 <br><br> 4(n+1)=
    6·2 answers
  • Show all work to factor x4 - 5x2 + 4 completely.
    9·1 answer
  • Simplify 3.3√40-4.3√320-3√5​
    15·1 answer
  • A factory makes 5,301 plastic forks per hour. How many plastic forks will the factory make in 51 hours?
    11·1 answer
  • Addition and subtraction <br><br> (6i) + (-7- 4i) + 5
    12·1 answer
  • The radius of a circle is (7x+3)cm. Write an expression to represent the area of the circle in simplified form
    6·1 answer
  • 2.
    11·1 answer
  • Find f(-4) for f(x)=9(3)^x
    10·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!