B. Because major shifts in thinking can cause change.
Answer:
Big Bang or Phased Approach – ERP Implementation strategies include Big Bang, Phased, Hybrid, and Parallel Adoption. Each organization requirements are different and as such, the project management method is itself evolving using PPM, SCRUM, and DevOps.
Answer:
The answer to this question can be given as:
Statement:
isQuadrilateral = (numberOfSides == 4) ? 1 : 0;
//check condition using ternary operator.
Explanation:
we know that both(Quadrilateral, numberOfSides) is already declared in the program. So the statement for check condition is (isQuadrilateral = (numberOfSides == 4) ? 1 : 0;). To check this condition we use the ternary operator. In this operator, we also check another condition. The syntax of ternary operator (condition ? value_if_true : value_if_false).In this statement on the lift side we use the variable for check condition and right side we check condition if the value is true it prints 1 else it will print 0.
Answer
CPUID opcode
Explanation
CPUID opcode is a processor supplementary instruction that allows the software to discover the details of a processor. It configures CPU multipliers and speeds The CPUID opcode is derived from CPU identification