Answer:
12 weeks
Step-by-step explanation:
Step one:
given data
let the heights of the plants be y
and the number of weeks be x
Plant A
y=3x+8.5--------------1
Plant B
y=2.5x+14.5----------2
Required
The number of weeks taken for both plants to have the same height
,equate the two expressions above
3x+8.5=2.5x+14.5
3x-2.5x=14.5-8.5
0.5x= 6
divide both sides by 0.5
x= 6/0.5
x= 12 weeks
Answer:
d. 1 grid equals 1 hour
Step-by-step explanation:
When plotting research data, X-axis(or horizontal axis) usually used for independent variable and Y-axis is used for the dependent variable. In this case, Heather wants to know how much earning on different numbers of hours. The dependent variable is the earning and the independent variable is the hours, so you put hours on the horizontal axis.
You want to make a 10x10 grid of data and the hours ranged between 1-10. If you plot them equally, approximate scale will be: (10h-1h)/(10)= 0.9h/grid
The closest option is 1 hour per grid. It will provide the best visualization since it won't stretch or minimize the data too much.
Largest 5-digit number is 54312 and is divisible by 6. The smallest 5 digit number is 12,345 and it's not divisible by 6
A polynomial function is a function involving only non-negative (positive and 0) integer powers of 'x', i.e. all terms with ' 'x' have a non-negative integer power, such as a quadratic
and so on.
Option E is the answer.
Rest all are wrong answers. they do not have positive integers.
Answer:
z = 8.2
Step-by-step explanation:
6.7z = 5.2z + 12.3
combine like terms by subtracting 5.2z from both sides
1.5z = 12.3
divide by 1.5
z = 8.2