Assume that the total overhead variance is x
We are given that the total labor variance is twice the total overhead variance. This means that, the total labor variance is 2x
Total variance can be calculated as follows:
Total variance = Total materials variance + Total overhead variance
+ Total labor variance
We have:
Total variance = $35000
Total materials variance = $14000
Total overhead variance = x
Total labor variance = 2x
Substitute in the equation and solve for x as follows:
35000 = 14000 + x + 2x
35000 - 14000 = 3x
21000 = 3x
x = 21000/3
x = 7000
Based on the above calculations:
Total overhead variance = x = $7000
Total labor variance = 2x = 2*7000 = $14000
What form do you need it in?
The Answer Is 57.92 But the easiest way to do it is Rounding it
If a secant<span> and a </span><span>tangent of a circle </span><span>are drawn from a point outside the circle, then the product of the lengths of the secant and its external segment equals the square of the length of the tangent segment.
</span><span>
y</span>² = 7(15+7)
<span>y</span>² = 7*22
<span>y</span>² = 154
<span>y = </span>√154
<span>y = 12.4 </span>← to the nearest tenth<span>
</span><span>
</span>
Answer:
Well..
Step-by-step explanation:
Do 23,882 by 11, then do the answer of that problem divided by 11 and so on