1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
otez555 [7]
2 years ago
13

What is the consecutve whole numbers of

sqrt{40" align="absmiddle" class="latex-formula">
Mathematics
1 answer:
Inessa [10]2 years ago
3 0

Step-by-step explanation:

\sqrt{36}  <   \sqrt{40}  <   \sqrt{49}

So sqrt(40) lies between 6 and 7.

You might be interested in
Distribute 8[(x + (-3)]​
Lemur [1.5K]

Answer:

8x-24

Step-by-step explanation:

8(x-3)

8 times x= 8x

8 times-3= -24

8 0
2 years ago
Which ratio correctly compares 150 mm to 60 cm?
BartSMP [9]
Convert 150mm into cm = 15cm   
So 15cm to 60cm 
Divide by 15
B. 1 to 4
6 0
3 years ago
Question 13 * A farmer can plant 45 kg of peanuts on 4,000 square metres of land. Which of the following represents the number o
shtirl [24]
Answer: 765/8





Explanation: your mom told me lastnight
7 0
2 years ago
Read 2 more answers
In 4 ​minutes, a conveyor belt moves 800 pounds of recyclable aluminum from the delivery truck to a storage area. A smaller belt
kkurt [141]

Answer:

It takes 2 minutes 4 seconds to move the cans to storage area if both the belts are used.

Step-by-step explanation:

Given - In 4 ​minutes, a conveyor belt moves 800 pounds of recyclable

            aluminum from the delivery truck to a storage area. A smaller belt

            moves the same quantity of cans the same distance in 6 minutes.

To find - If both belts are​ used, find how long it takes to move the cans

              to the storage area.

Proof -

Given that,

Larger belt take 4 minutes to transfer the aluminium from delivery truck to storage area.

⇒ Time taken by Larger belt = 4 min/ shifting

Also,

Smaller belt take 6 minutes to transfer the aluminium from delivery truck to storage area.

⇒ Time taken by Smaller belt = 6 min/ shifting

Now,

As we know that Time is inversely proportional to time, so

Rate of Larger Belt = \frac{1}{4} shifting/min

Rate of Smaller Belt = \frac{1}{6} shifting/min

Now,

Let us assume that , if both belts used then,

Total time taken = x min/shifting

Then, Rate = \frac{1}{x} shifting/min

Now,

\frac{1}{4}  + \frac{1}{6}  = \frac{1}{x}

⇒\frac{6 + 4}{24} = \frac{1}{x}

⇒\frac{10}{24} = \frac{1}{x}

⇒10x = 24

⇒x = \frac{24}{10} = 2.4 minutes

∴ we get

It takes 2 minutes 4 seconds to move the cans to storage area if both the belts are used.

3 0
2 years ago
Find the value of n in 7 times 38 plus 3 times 45 minus 56
Alex787 [66]
7 * 38 + 3*45 - 56 
use order of operations 
(7*38) + (3*45) - 56

266 + 135 - 56

=345
3 0
3 years ago
Other questions:
  • PLZ HELP I DONT UNDERSTAND PLZ
    12·1 answer
  • Which of these is the composite function f(g(x))? f(x) = x2 – 5 g(x) = 9x – 2
    11·1 answer
  • What is most likely the correlation coefficient for the set of data shown
    8·1 answer
  • 54 is 120% of what number? Explain please!
    11·2 answers
  • The equation A = p + prt is used to find the accumulated amount, A, of an investment with principal, p, a certain interest rate,
    9·2 answers
  • Which expression is the factorization of x2+10+21?
    10·1 answer
  • Name two pairs of pallel lines in the figure
    15·2 answers
  • Onvert the unit of weight. Enter your answer in the box.<br><br> 3/4 lb = <br> oz
    12·1 answer
  • Please help me on the picture above. I will give points and give five stars for correct answer.
    11·2 answers
  • What’s the answer to this question
    11·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!