Answer:
Step-by-step explanation:
Two consecutive integers be x  and (x+1)
x + x +1 = 7² 
2x + 1 = 49
2x = 49 - 1
2x = 48
x = 48/2
x = 24
The consecutive integers are: 24,25
 
        
             
        
        
        
Answer:
True
Step-by-step explanation:
The variable overhead rate variance refers to the difference in two variables.
The Variables are
1. The actual variable manufacturing overhead
2. The expected variable overhead given the number of hours worked
Labor rate variance is evaluated by 
AH(AR - SR)
 
AH = actual hours
AR = actual rate 
SR = standard rate.
The variable overhead rate variance is also calculated the same way except that it replaces the direct labor rates with variable overhead rates
 
        
             
        
        
        
Answer:
85 ft^2
Step-by-step explanation:
The four sides of the pyramid: 5×6÷2×4=60
The bottom of the pyramid: 5×5=25
60+25=85 ft^2
 
        
             
        
        
        
Answer:
5089.4cm³ (rounded to 1 d.p.) 
Step-by-step explanation:
Volume of cylinder =  × r² × h
 × r² × h
Volume of cylinder =  × 9² × 20
 × 9² × 20
                                 = 1620 
 
                                 = 5089.4cm³ (rounded to 1 d.p.) 
 
        
             
        
        
        
Answer:
7 g.
Step-by-step explanation:
7g = 7000 mg