Answer:
The data is a simple random sample from the population of interest.
Step-by-step explanation:
Conditions necessary to consider when constructing a confidence interval include using a large sample size, which should be greater Than or equal to 30 for n and a sample proportion of np ≤ 10. Importantly the sample must be a random sample drawn from the population, meaning that all the population of interest must have equal chances of being a part of the sample data. However, the scenariomabiveb, violates this condition as the sampling design is not completely randomized. Those who do not ply the route on that certain day have no Chaves of being part of the sample.
1
The variable in this case is v, and no coefficient is given, so it can be assumed to be 1.
A figure formed by 3 segments connecting 3 non-colinear points
B is the correct answer for your question I do believe, I hope that helped you. If not I am sorry, I tried to answer fast for you.
Answers: A) $44,944
B) $50,499.0784
Math: Using the percentage calculator linked below 6% of $40,000 is $2,400. Since you're getting your second raise after your first and since it is a 6% raise from what you're getting paid at that time we add pay raise 1 to your starting pay before calculating the 6% for pay raise 2. $40,000+$2,400=$42,400. 6% of $42,400 is $2,544. $42,400+$2,544=$44,944, Since that is two pay raises that would be your earnings at the end of year two (answer A).
We continue calculating 6% then adding that onto the total before calculating it for the next year for problem B.
6% of $44,944 is $2,696.64. $44,944+$2,696.64=$47,640.64.
6% of $47,640.64 is $2,858.4384. $47,640.64+$2,858.4384=$50,499.0784. That's answer B.
Hopefully you can figure out C on your own! I feel a little bad for giving a partial answer but I think you can do this!
Percentage calculator used-https://percentagecalculator.net/
Note: can't handle commas, remove all commas before entering data in.