I'm doing the same one right now lol, also if anyone gives you a link , don't open it . it can be a hacker . Step-by-step explanation:
What is the question itself?
The ratio for this problem is 1:5.
If you are drawing 14 pentagons, you would do 14 x 5.
14 (pentagons) x 5 (line segments) = 70 line segments in total.
The answer is C) 70
Answer: b. 0.98
Step-by-step explanation:
The formula to find the maximum error of the estimated mean :
(1)
, where
= standard deviation
n= Sample size
z* = Critical z-value.
As per given , we have

n=100
Critical value for 95% confidence interval = z*=1.96
Put these values in the formula (1), we get


Hence, the maximum error of the estimated mean quality for a 95% level of confidence is 0.98.
Therefore , the correct answer is b. 0.98 .