Answer:
2(8a + 8)
Step-by-step explanation:
The easiest way to do this is to substitute <em>a</em> for a number. For example, let's just make things easy and make <em>a </em> = 1.
So, if a = 1, the expression 16a + 8 would be 16(1) + 8 = 24.
Let's find all the expressions that would also equal 24 if <em>a = </em>24.
Plug in 1 for <em>a</em> in each of the equations. You will find that 2(8a + 8) will not equal 24 if <em>a </em>equals 1.
2(8a + 8)
2(8(1) + 8
2(8 + 8)
2(16)
32
Answer:
Hey what'sup?
You need to dig a little in, for what it's actually meaning
Here the total is 720 right?
Which came from the materials and the labors work in hourly basis
So it's like
Cost of the material + no of hours = bill
We don't know what the no of hours are, so let's assume it as 'x'
Hence the required equation is
375+35*x=720
35*x = 720-375
35*x = 345
Therefore x=345/35 =9.8
Therefore they worked for 9.8 hours or approximately 10 hours
Peace out
Answer:
d= -5
Step-by-step explanation:
The slope of a line is found by finding the ratio of change is y values to change is x values

The points on the line have coordinates at: (-1,7) (-3,d)
where ;

Applying the formula with values as;

The value of d = -5
The coordinates of the points (-1,7) (-3,-5)