1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Sergio039 [100]
2 years ago
6

Find the area of the shaded polygons NEED ASAP PLEASE!! THANK YOU

Mathematics
1 answer:
goldenfox [79]2 years ago
8 0

Answer:

168

Step-by-step explanation:

area of a trapezoid is

((a+b)/2)*h

((8+16)/2)*14

12*14 =

168

You might be interested in
5c + 3 -2c + 5 simplify the expression
snow_lady [41]
5c + 3 - 2c + 5

        5c - 2c + 3 + 5
 
               3c + 8 ~~~
3 0
3 years ago
Read 2 more answers
<img src="https://tex.z-dn.net/?f=%20%5Cfrac%7B5%7D%7B6%7D%20%20%2B%20%28%20%5Cfrac%7B4%7D%7B9%7D%20%29%20-%20%28%20-%202%29" id
Lady_Fox [76]

get a common denominator of 18

5/6 * 3/3 +4/9 * 2/2 - -2*18/18

15/18 +8/18 + 36/18

23/18 + 36/18

59/18

change to a mixed number

18 goes into 59 3 times with 5 left over

3 and 5 /18

6 0
3 years ago
Please need HELP with A, B, and C!!
Simora [160]

Answer:

as in pic below

Step-by-step explanation:

7 0
2 years ago
What is the appropriate sequence of events for protein synthesis?
Alborosie

The correct sequence of events in protein synthesis is transcription, then translation.

7 0
3 years ago
The Sureset Concrete Company produces concrete. Two ingredients in concrete are sand (costs $6 per ton) and gravel (costs $8 per
Maksim231197 [3]

Answer:

The Sureset Concrete Company

The tons of gravel and sand that should be purchased each day are:

Sand = 800 tons

Gravel = 700 tons

Step-by-step explanation:

Two ingredients for producing concrete = sand and gravel

Cost of sand per ton = $6

Cost of gravel per ton = $8

Sand and gravel = 75% of the concrete

Therefore 25% (100 - 75%) will be made up of cement and water

Tons of concrete produced each day = 2,000

Sand and gravel = 1,500 (2,000 * 75%)

Sand <= 40% of 2,000 = 800 tons

Gravel => 30% of 2,000 = 700 (1,500 - 800) tons

To minimize costs,  800 tons of gravel and 700 tons of sand should be purchased each day.

Total cost incurred daily for both sand and gravel = $10,400 (800 * $6 + 700 * $8)

3 0
3 years ago
Other questions:
  • Match the steps to find the equation of the parabola with focus (-1, 2) and directrix x = 5.
    14·1 answer
  • The sides of a triangle measure 2.24 inches, 3.56 inches, and 4.50 inches. What is the perimeter of this triangle? Report the an
    6·2 answers
  • What is the value of F in the formula F=9/5C+32 when C=30?
    5·2 answers
  • Your sister is getting married this summer and she has asked you to help her select a D.J.
    13·1 answer
  • Write an expression to represent the perimeter of:
    9·1 answer
  • 3. HELPPP asaaaaaapppppp
    7·1 answer
  • Brielle and Joshua are running a half marathon race, which is
    13·1 answer
  • I need help please it’s hard for me
    13·1 answer
  • Leila bought 4 CDs that were each the same price. Including sales tax, she paid a total of 58.80. Each CD had a tax of 0.90. Wha
    14·1 answer
  • 15 cm<br> 4 cm<br> cm<br> V=____cm3
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!