Answer:
a) 60 mi/hr
b) 2768.89
c) 2715.65
d) 1.25° and chord length is 26.18 ft
Explanation:
See attached pictures.
Answer:
Soil engineering helps in analyzing the structure and composition of the soil of the proposed construction site, thus helping in deciding whether the soil of the proposed construction site or building is worth exploiting.
Answer:
Racking is the term used for when buildings tilt as their structural components are forced out of plumb. This is most commonly caused by wind forces exerting horizontal pressure, but it can also be caused by seismic stress, thermal expansion or contraction, and so on.
Explanation: