Answer:
Part B: 8 and 2 (more answers ofc)
Part C: Two more dots on 6 (more than one answer tho)
Step-by-step explanation:
<em>Part B:</em>
The added number of dots is 39 at the beginning and the mean is 3.9. (39/10). Since we have to add 2 dots the equation will be (<em>39 + ? + ?) / 12 = Less than 3.9</em>. We also need the range to increase. This means that one of the blanks must be larger than 7 (the largest dot on the dot plot!) I just went with 8 to keep the mean as small as possible. This leaves 1 more blank to figure out. There are multiple answers to this problem but I went with 2 just because then the mean would be 3.5 a better answer than something like 3.58333333333.
<em>Part C:</em>
If you think about it all the dots added up should be 6x12 = 72. Currently all the dots add up to 60. 72-60 is 12. This means that 12 is equal to 2 dots. I guess you could also do 5 and 7, 8 and 4, etc.
G'day
-birb
Can you take a better picture
Answer:
a triangle with angles of 13, 48, and 131 degrees
Step-by-step explanation:
All the triangles equal to 180
Answer:
C. unlikely
Step-by-step explanation:
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
A probability is said to be extremely likely if it is 95% or higher, and extremely unlikely if it is 5% or lower. A probabilty higher than 50% and lower than 95% is said to be likely, and higher than 5% and lower than 50% is said to be unlikely.
In this problem, we have that:

How likely is it that a single survey would return a mean of 30%?
We have to find the pvalue of Z when X = 0.30.



has a pvalue of 0.1587.
So the correct answer is:
C. unlikely
Answer:
9y + 4z + 9x
Step-by-step explanation: