Answer:
sx
Step-by-step explanation:
The first missing number in the sequence is 35, and the last missing number is 77.
<h3>Next number of the given sequence</h3>
The two missing numbers in the given sequence is calculated as follows;
= ? 49 63 ?
The given sequence is factor 7 which increases by 2
= 7 x 5 7 x 7 7 x 9 7 x 11
= 35 49 63 77
Thus, the first missing number in the sequence is 35, and the last missing number is 77.
Learn more about sequence here: brainly.com/question/6561461
#SPJ1
Hey there!
The answer is D. 1/5
An explanation is in the attached image below.
Hope this helps!
Answer: Hi!
So first, I'm going to convert "350 below ground level" to -350, as this is what "below ground level" represents.
Now, we should find the total distance traveled. Take the absolute value of -350 (350) and add it to 10, the metres above ground level. This is 360.
We already know the rate of travel; 6m/min. All we have to do now is divide the total distance (360) by the rate of travel (6)!
360 ÷ 6 = 60
So, it took 60 minutes, or one hour, for the elevator to travel down the shaft!
Hope this helps!
Answer:
1.68 as a percent is 168%.
Step-by-step explanation:
To convert 1.68 to a percentage, multiply the number 1.68 by 100.