0.726 is the probability that the project will be completed in 33 days or less.
Step-by-step explanation:
We are given the following information in the question:
Mean, μ = 30 days
Variance = 25 days
Standard Deviation,

We assume that the distribution of path length is a bell shaped distribution that is a normal distribution.
Formula:

P(completed in 33 days or less)
Calculation the value from standard normal z table, we have,

0.726 is the probability that the project will be completed in 33 days or less.
Answer:
B
Step-by-step explanation:
Because i took the test
Answer:
48
Step-by-step explanation:
So your equation is: 5y3 - 21 + 6y2 + (25 ÷ 5) and y = 2.
Evaluate for y=2
5(23)−21+6(22)+
25
5
5(23)−21+6(22)+
25
5
=48.
So the answer is 48.
Answer:
1. 180
2. x = 31
Step-by-step explanation:
1. the sum of the interior angles of every triangle is always 180
2. using what we know from problem 1, we can create an equation:
x + 10 + 2x - 5 + 2x + 20 = 180
add like terms: 5x + 25 = 180
subtract 25 from both sides: 5x = 155
divide both sides by 5: x = 31