1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
arsen [322]
2 years ago
11

How do sentinel controls and flag controls relate to infinite loops?

Computers and Technology
1 answer:
alexira [117]2 years ago
3 0

ask LeBron he knows hoops

You might be interested in
Which type of operation writes the file system structure to the disk?
n200080 [17]
Formatting<span> writes the file system structure to the disk.</span>
8 0
3 years ago
9. Changing from a bystander to an advocate requires
Rina8888 [55]
9
The answer is bravery
6 0
2 years ago
If the executives for Office Max LLC, a chain of office supply stores, developed the chain's objectives by asking buyers and sto
love history [14]

Answer:

It would be an example of bottom-up planning

Explanation:

Bottom-Up Planning is a method of planning that defines objectives and ways to achieve them through the bottom up. It relatively narrows goals that are initially set at the lower levels of the organizational hierarchy. First, relatively close targets at lower levels of the organizational hierarchy are set. They are then gradually integrated into the framework of global goals and global strategy at higher and higher levels. It is therefore a convergent approach.

With bottom-up planning, you give your project deeper focus because you have a larger number of employees involved in the project, each with their own area of expertise. Team members work side-by-side and have input during each stage of the process. Plans are developed at the lowest levels and are then passed on to each next higher level. It then reaches senior management for approval.

8 0
4 years ago
Create an application named TurningDemo that creates instances of four classes: Page, Corner, Pancake, and Leaf. Create an inter
pickupchik [31]

Answer:

1) TurningDemo

public class TurningDemo

{   public static void main(String[] args)

 {      

    Leaf obj1 = new Leaf();

    Corner obj2= new Corner();

    Page obj3= new Page();

    Pancake obj4= new Pancake();

 } }

2) ITurnable

public interface ITurnable

{

 public void Turn();

}

3) Leaf class:

public class Leaf implements ITurnable

{

}

Page class:

public class Page implements ITurnable

{

}

Corner class:

public class Corner implements ITurnable

{

}

Pancake class:

public class Pancake implements ITurnable

{

}

Explanation:

The first is TurningDemo application which creates instance obj1, obj2, obj4 and obj4 of four classes Page, Corner, Pancake, and Leaf. new keyword is used to create new object or instance of each class.

The second is ITurnable interface. It contains a single method Turn() which is of type public.

Thirdly, classes named Page, Corner, Pancake, and Leaf implement ITurnable. implements keyword is used to implement a interface so this interface can be used by these classes.

These classes can also implement turn() of ITurnable interface as follows:

Leaf class:

public class Leaf implements ITurnable

{  public void turn()

 {

 }

}

Page class:

public class Page implements ITurnable

{

public void turn()

 {

 }

}

Corner class:

public class Corner implements ITurnable

{ public void turn()

 {

 }

}

Pancake class:

public class Pancake implements ITurnable

{   public void turn()

 {

 }

}

4 0
4 years ago
Different project management steps are initiating, planning, executing, monitoring and controlling, and closing a project. Which
ser-zykov [4K]

Answer:

All steps of project management until the closure of the project are very critical and important for the success of the project.

Explanation:

The steps that are very critical and important for the success of the project.

Initiation:

This is a very beginning step of any project in the project management practices. In this step, mainly, project feasibility is carried out and drafted. at this step, management takes decisions that this project would be profitable or not for the organization. If proper measure and future prediction do not measure properly then this stage would affect the project success criteria. Because, if the base of any project is built on the wrong steps and measures, will lead to failure. At this stage, management takes the decision based on a feasibility document and business case document to ensure if it feasible or profitable to the organization.

Planning:

This is a very crucial step of project planning, and mistakes in this stage will lead the project toward failure. after receiving the green signal at the initiation stage, the proper project plan is carried out in a documented form. This project plan will guide the project manager and all stakeholders of the project in making the project successful. So, a well-written project plan is very critical and important for project success than any other phase of project management. Because the project plan gives the direction to the team to carried out the project execution process smoothly, it helps in handling risk and mitigation strategies to solve the risk, finance management, task management and in achieving timely deliverables.

Execution:

The planning phase and execution phase are most commonly associated with project management. This phase of project management is all about building deliverables and ensure timely delivery to customers for their satisfaction.  Team leader and/or project manager make this happen by allocating the required resources to develop the deliverables and keeping team members focus on their assigned tasks. This phase relies on the project  planning phase.

Monitoring and Controlling:

Monitoring and controlling are sometimes combined with the execution phase of the project because they often occur at the same time and carried out parallel to each other. At this stage, team performance, progress, and other project-related matrices are carried out to track their own progress. In this stage, key performance indicators are calculated, track variation from allocated resources such as cost and time, etc. This stage is important for project success, because if you don't deliver the quality and timely work then you may linger the project that directly affects the project cost and time.

Closure:

The team closes the project as they finished the project and customers/stakeholders approve the project output i.e product and then release the resources. This step is not crucial for project success as other all of the previous stages. but at this stage, effective communication, document finalization, and lesson learned document are required.

6 0
4 years ago
Other questions:
  • The user interface design principle that places an emphasis on the intuitive flow of the interface (i.e. left to right and top t
    12·1 answer
  • Write a method called evenBeforeOdd that accepts an array of integers and rearranges its elements so that all even values appear
    15·1 answer
  • What is ATX full size motherboard? Tell its size as well?
    14·1 answer
  • Which is the largest unit of measurement for computer data?
    14·1 answer
  • Median of a sample If the distribution is given, as above, the median can be determined easily. In this problem we will learn ho
    15·1 answer
  • A technician is troubleshooting an employee laptop that has a wired network connectivity issue. The laptop can connect to the in
    9·2 answers
  • Assume the existence of a Building class with a constructor that accepts two parameters: a reference to an Address object repres
    7·2 answers
  • How many cells are included in the range A1:B3
    10·1 answer
  • What are the most positive and the most negative decimal numbers that can be represented by a 2C (n+k) bit fixed-point number, w
    12·1 answer
  • Explain the different type of shift register counter ​
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!