Answer:
It takes 5 days to process an application.
Step-by-step explanation:
We have that number of requests per month would be equal 1600
Now, the applications in hand would be:
160 + 240 = 400
They tell us that everything must be in a number of 20 business days, therefore, the number of applications in one day would be:
1600/20 = 80
Which means that the time needed to finish an application is:
400/80 = 5 days
It takes 5 days to process an application.
Price for <span>roller coaster ride:x
</span><span>Prices for the entry fee:y
</span><span>From table: for 5 rides total price is $35: 5x+y=35
for 11 rides total price is $59: 11x+y=59
</span><span>5x+y=35⇒y=35-5x
</span><span>11x+y=59
y=35-5x
11x+35-5x=59⇒6x=59-35
y=35-5x
6x=24⇒x=24/6
x=4⇒y=35-5*4
y=15
Price for entry fee is $15, </span><span>and for each roller coaster ride $4.</span>
I believe it’s 32.7 ksmakksmakaomwkaimwnsiaklalaowkwnne
Answer: 25/676
Step-by-step explanation:
Number of possible outcomes = 26
In other to win, one must draw must be either (A, E, I, O or U)
Therefore required drws to win = 5
First draw:
P(win) = Total required outcome / Total possible outcome
P(win) = 5/26
Second draw:
P(win) = Total required outcome / Total possible outcome
P(win) = 5/26
Therefore,
P(winning twice) = (5/26) × (5/26) = 25/676