Answer: B 21
How?
Break it into smaller pieces
5*3= 15 (big box with out small extension)
3*2= 6 (small extension of large box. It 3 because I’m only looking for the area of the small extension)
15+6= 21
Hope this helps
Ok I did some work on this and I got 10.071 and we rounded this to the nearest 10 we would get 10
Tell me if this right
Answer:
True
Step-by-step explanation:
The variable overhead rate variance refers to the difference in two variables.
The Variables are
1. The actual variable manufacturing overhead
2. The expected variable overhead given the number of hours worked
Labor rate variance is evaluated by
AH(AR - SR)
AH = actual hours
AR = actual rate
SR = standard rate.
The variable overhead rate variance is also calculated the same way except that it replaces the direct labor rates with variable overhead rates
You have 0.15 + 0.36 just like you would just add normal so 1. Would be 0.51 and the other one would be 0.15
A is your answer!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!