Answer:
The slope is -2
Step-by-step explanation:
The slope of a line is given by
m = (y2-y1)/(x2-x1)
= (8-4)/(0-2)
= 4/-2
= -2
When the balloon is on the ground, it is at point 0. It starts to go up at 5 f/m for a time of 4 minutes. So we will multiply 5 by 4 to get 20. At this point, the balloon is 20 feet off the ground. However, we now know that the balloon descends at 2 f/m at a time of 7 minutes. So we must multiply 2 by 7 to get 14. So we know it was at 20, and then it went down by 14.
20 - 14 = 6 feet
This means that the balloon is now 6 feet above the ground.
I hope I've helped! :)
Answer:
C
Step-by-step explanation:
A "zero" of a function is an input value that makes the function value equal zero. On the graph these input values are -3 and 1; you can see that the function values are zero in both cases. C is correct.
In the table and chart, we have let x represent numbers of Rock CDs and y represent numbers of Rap CDs.
a) The purple dots represent feasible solutions. Their coordinates are listed in the table (for coordinates on the lines) and as a list of points (for points between the lines).
b) The feasible region for total time in hours is shaded blue.
c) The feasible regiion for total cost is shaded red.
d) The overlap of the two regions is shaded purple. The combinations that are feasible are purple dots in that region.
e) The equations used are listed at the left side of the chart. The equations are labeled by color. (≤112 is the cost equation; ≥75 is the hours equation)
ea) The area that is feasible with respect to both constraints is doubly-shaded.
eba) Too much money is spent to the right of the red line.
ebb) Too few hours are used to the left of the blue line.
f) The line for the desired profit is parallel to the "hours" line, but has x-intercept 10 and y-intercept 6. All the points shown except the two on the lower line will give the desired profit.
g) The higher profit line goes through the points (3, 7) and (8, 4). Those two combinations and the points on or near the upper line above y=4 will meet the higher profit requirement.
1,2,3,4,6,8,12,24 are the factors. Hope it helped!!!!!