Since if he gets the driveway done in 20 minutes he gets 1/20th of the driveway done in 1 minute (if x=20 then x/20=1 by dividing both sides by 20) and if his brother gets 1/12th of the driveway done in one minute, then if t represents the time it takes to shovel the driveway, t/20+t/12=1 driveway shoveled as 1/20+1/12=amount they can do in 1 minute, so t/20+t/12 is how much they can do in t minutes. Multiplying both sides by 20*12=240, we get 12t+20t=32t=240. Dividing both sides by 32, we get 240/32=7.5 minutes to shovel the driveway.
Answer:
x = lillies
y = tulips
x + y = 13
1.25x + .90y = 14.85
-1.25x - 1.25y = -16.25
1.25x + .90y = 14.85
-0.35y = -1.40
y = 4 tulips
x + 4 = 13
x = 9 lillies
(9 lillies, 4 tulips)
Step-by-step explanation:
Answer:
The car is going 45 mph
Step-by-step explanation:
Since the speed limit is 35 mph and the car is 10 mph over the speed, we can add them to find out how fast the car is going. We can solve 35+10 which will give us 45. So it is not a sum of 0 but instead a sum of 45.
(hope this helped)
-(3/4) (12)+1 = -9+1=. -8