Answer:
- 16 acres of barley only (no acres of wheat)
Step-by-step explanation:
A graph shows cost of planting puts an upper limit on planted area. The lower limit is provided by the requirement to plant at least 15 acres. The vertices of the feasible solution region are ...
(wheat acres, barley acres) = {(0, 15), (0, 16), (3, 12)}
The profit associated with these scenarios will be ...
for (0, 16): 16·350 = 5600
for (3, 12): 3·450 +12·350 = 1350 +4200 = 5550
To maximize profit, the farmer should plant 16 acres of barley.
Iiiiiiiiiiiiiiiiiiiiii ammmmmmm not sure
Answer:
Answer
Did u put any picture because i think there should be a picture
Given data:
The first set of equations are x+y=4, and x=6.
The second set of equations are 3x-y=12 and y=-6.
The point of intersection of first set of te equations is,
6+y=4
y=-2
The first point is (6, -2).
The point of intersection of second set of te equations is,
3x-(-6)=12
3x+6=12
3x=6
x=2
The second point is (2, -6).
The equation of the line passing through (6, -2) and (2, -6) is,
Thus, the required equation of the line is y=x-8.
It would go 880 km in 11 hours, and it would take 14 hours to go 1120 km