Answer: it is 10 over 100
Step-by-step explanation:
Answer:
most common, 4, c, 9
Step-by-step explanation:
Answer:
The equation is y = 4x + 5
Step-by-step explanation:
To find the equation to this table, pick two ordered pairs and use the slope formula to find the slope. For this we'll use (4, 21) and (8, 37).
m(slope) = (y2 - y1)/(x2 - x1)
m = (37 - 21)(8 - 4)
m = 16/4
m = 4
Now we can use that slope along with any point in point-slope form to find the equation.
y - y1 = m(x - x1)
y - 21 = 4(x - 4)
y - 21 = 4x - 16
y = 4x + 5
Answer:
37.5 °C
Step-by-step explanation:
The temperature appears to be increasing linearly at the rate of 5 °C in 2 minutes, or 2.5 °C per minute.
1 minute after 4 minutes, when the temperature is 35 °C, we expect it to be 2.5 °C higher, or 37.5 °C.
Answer: Area = 6m²
Smaller number = 16
Hours = 9.6 h
Step-by-step explanation:
A rectangle is 5 meters longer than its width. If the length is shortened by 2 meters and width is increased by 1 meter, the area remains the same. Find the area of the rectangle.
1) w = x m 2) w = x + 1 m
l = x + 5 m l = x + 5 - 2 = x + 3 m
A₁ = A₂
A = w*l
A₁ = x(x+5) = x² + 5x
A₂ = (x+1)(x+2) = x² + x + 2x + 2 = x² + 3x + 2
A₁ = A₂
x² + 5x = x² + 3x + 2
5x - 3x = 2
2x = 2
x = 1
A₁ = x(x+5) = 1.6 = 6 m²
The ratio of two numbers is 2:5. If the larger number is 40, what is the smaller number.
<u> 2 </u> = <u> x </u>
5 40
5x = 80
x = 80/5 = 16
Sixteen construction workers can finish cementing a floor of a building in 3 hours. On a certain day, only 5 construction workers are available for the job. How long will it take the 5 construction workers to do the cementing job?
workers hours
16 3
5 x
↑ ↓ inversely proportional
<u> 5 </u> = <u> 3 </u>
16 x
5x = 16*3
5x = 48
x = 48/5
x = 9.6 h