Answer:
Step-by-step explanation:
the Gradient is (5,2)
The correct answer for the question that is being presented above is this one: "0.5" <span>The probability that a normal random variable is less than its mean is 0.5. In a normal distribution, 1.0 refers to the one that is stable and is in equilibrium.</span>
Answer:
The costs of the plan are $0.15 per minute and a monthly fee of $39
Step-by-step explanation:
Let
x ----> the number of minutes used
y ----> is the total cost
step 1
Find the slope of the linear equation
The formula to calculate the slope between two points is equal to

we have the ordered pairs
(100,54) and (660, 138)
substitute


step 2
Find the equation of the line in point slope form

we have

substitute

step 3
Convert to slope intercept form
Isolate the variable y

therefore
The costs of the plan are $0.15 per minute and a monthly fee of $39
The correct answer is the last set of numbers
Answer:
3 hours
Step-by-step explanation:
Recall:
Distance = speed x time
we are given that speed = 18 km/h and distance = 54 km.
hence,
54 = 18 x time (divide both sides by 18 and rearrange)
time = 54/18 = 3 hours