Answer:
1. Inside the dorm room, the movies are <em>Non-Rival</em> which means that one person can watch the movie and it will not diminish the ability of others to watch as well.
Also as they are all in the same dorm, the showing of the movie is <em>Non-Excludable</em> as well because no one can stop the other from watching.
Public good is both Non-Rival and Non-Excludable so the showing of a movie IS a public good.
2.
Musashi Sean Bob Eric Total Willingness to pay
10 9 8 3 30
8 7 6 2 23
6 5 4 1 16
4 3 2 0 9
2 1 0 0 3
The optimal number of movies that can be rented is dependent on their total willingness to pay. If their Total willingness to pay for the movie is above $8 which is the cost of a movie, then they will get it. From the table, the fifth movie is below the price of $8 so they <u>should rent 4 movie</u>s.
3. If they rent 4 movies and there are 4 of them then the cost per person is;
= (8 *4)/4 people
= 24/4
= $8
This means that each roommate will pay <u>$8</u>.
Answer:
More-deceloped country
Explanation:
Industrialized countries with high per capita incomes, such as Canada, England, France, Germany, Japan, and the United States fall into the category of more-developed country
Nobles thoughts referred to is B. Expectancy theory. The expectancy theory refers to someone knowing how someone else will react based on motivators. If there is a specific motivator that an employer knows an employee refers to with positive behaviors, there is a good chance the employeer will be able to guesstimate what the end result of the situation would be. In this case, Howie needs to spend more time learning what his employees like and dislike to figure out a way to keep them motivated long term.
Answer:
$7.50 per unit
Explanation:
Cost of buying from outside supplier = $33 per unit.
Relevant cost of making such component in-house = Direct materials+ Direct labor+ Variable overhead
= $9.50 per unit + $13.50 per unit + $2.50 per unit
= $25.50 per unit
Net incremental cost of buying the component = Cost of buying from outside supplier- Relevant cost of making such component in-house
= $33.00 per unit - $25.50 per unit
= $7.50 per unit