<h3>
Answer: </h3><h3>
speed of train A = 44 mph</h3>
=============================================
Work Shown:
x = speed of train A
y = speed of train B
"train A travels 4/5 the speed of train B" (I'm assuming "train one" is supposed to read "train B"). So this means x = (4/5)y
distance = rate*time
d = x*7
d = (4/5)y*7 = (28/5)y represents the distance train A travels
d = y*7 = 7y represents the distance train B travels
summing those distances will give us 693
(28/5)y + 7y = 693
5*( (28/5)y + 7y ) = 5*693
28y + 35y = 3465
63y = 3465
y = 3465/63
y = 55
Train B's speed is 55 mph
4/5 of that is (4/5)y = (4/5)*55 = 4*11 = 44 mph
Train A's speed is 44 mph
Answer:
Here it is
Step-by-step explanation:
You are 58 dollars in debt, and your friend pays you 73 dollars. How much money do you have? Does that work for you?
Answer:
150
Step-by-step explanation:
Because I looked it up
Answer:
(a) 
The expected number in the sample that treats hazardous waste on-site is 0.383.
(b) 
There is a 0.000169 probability that 4 of the 10 selected facilities treat hazardous waste on-site.
Step-by-step explanation:
Professional Geographer (Feb. 2000) reported the hazardous waste generation and disposal characteristics of 209 facilities.
N = 209
Only eight of these facilities treated hazardous waste on-site.
r = 8
a. In a random sample of 10 of the 209 facilities, what is the expected number in the sample that treats hazardous waste on-site?
n = 10
The expected number in the sample that treats hazardous waste on-site is given by




Therefore, the expected number in the sample that treats hazardous waste on-site is 0.383.
b. Find the probability that 4 of the 10 selected facilities treat hazardous waste on-site
The probability is given by
For the given case, we have
N = 209
n = 10
r = 8
x = 4




Therefore, there is a 0.000169 probability that 4 of the 10 selected facilities treat hazardous waste on-site.
Answer: 9 3/4 feet long
Explanation:
1 1/2 x 6 1/2 = 3/2 x 13/2 = 39/4 = 9 3/4 feet long