Answer:
The first, second, and fourth answer choices are correct.
Step-by-step explanation:
-2.5 is less than -2.
14 is equal to 14.
10 is greater than -12.
I hope this helped! :-)
Answer:
The margin of error of u is of 3.8.
The 99% confidence interval for the population mean u is between 27.4 minutes and 35 minutes.
Step-by-step explanation:
We have the standard deviation for the sample, which means that the t-distribution is used to solve this question.
The first step to solve this problem is finding how many degrees of freedom, we have. This is the sample size subtracted by 1. So
df = 28 - 1 = 27
99% confidence interval
Now, we have to find a value of T, which is found looking at the t table, with 27 degrees of freedom(y-axis) and a confidence level of
. So we have T = 2.7707
The margin of error is:

In which s is the standard deviation of the sample and n is the size of the sample.
The margin of error of u is of 3.8.
The lower end of the interval is the sample mean subtracted by M. So it is 31.2 - 3.8 = 27.4 minutes
The upper end of the interval is the sample mean added to M. So it is 31.2 + 3.8 = 35 minutes
The 99% confidence interval for the population mean u is between 27.4 minutes and 35 minutes.
Answer:
the probability that all tomatoes are sold is 0.919 (91.9%)
Step-by-step explanation:
since the random variable X= number of tomatoes that are demanded, is normally distributed we can make the standard random variable Z such that:
Z=(X-μ)/σ = (83 - 125)/30 = -1.4
where μ= expected value of X= mean of X (since X is normally distributed) , σ=standard deviation of X
then all tomatoes are sold if the demand surpasses 83 tomatos , therefore
P(X>83) = P(Z>-1.4) = 1- P(Z≤-1.4)
from tables of standard normal distribution →P(Z≤-1.4)=0.081 , therefore
P(X>83) = 1- P(Z≤-1.4) = 1 - 0.081 = 0.919 (91.9%)
thus the probability that all tomatoes are sold is 0.919 (91.9%)
Answer:
15 photos
Good luck & have a great day!