Linear measurements in construction most often expressed using the Common American foot/inch. In some instances metric measurements are used.
The correct answer to the question is : C)The problem is asking to solve for work; W = F × d
EXPLANATION:
As per the question, the distance covered by the object d = 29 m.
The force that acts on the object is F = 289 N.
We are asked to choose the correct equation for work done.
Work is said to be done on a body or by a body if the applied force has a component along the direction of displacement.
Mathematically work done W = force × displacement
= F × d
As per the question, we are given distance covered and applied force.
Hence, the correct equation for calculating work done by the object is equation C.
Normal force=m*g*cos theta
normal force=92kg*9.8m/s^2*cos 42
normal force=670 N
Answer:
Answer: 18.3 km/s
Explanation:
If a satellite in Molniya orbit has an apogee at 48.000 km as measured from the center of Earth, and a velocity of 3.7 km/s. Its velocity in at perigee would be 18.3 km/s.
Answer:
R= 5.4 ohms
Explanation:
Given that
V= 9 V
Power ,P= 15 W
Lets take resistor resistance = R
We know that Power given as

V=Voltage
P=Power
R=Resistance

Now by putting the all the values in the above equation

R= 5.4 ohms
Therefore the resistance of the resister will be 5.4 ohms.