Answer:
i also needed help on this qustion and the awnser is
Step-by-step explanation:
C.
its the same problem and nothing changed besides the order↑≠≈
<u>Answer:</u>
Cost of sand = £150
Cost of bricks = £157.5
Cost of cement = £134
Total cost = £441.50
<u>Step-by-step explanation:</u>
We are given that:
2 tonnes of sand is for £75.00 per tonne,
20 bags of cement are for £6.70 per bag,
350 bricks at 45p each,
So, 2 tonnes of sand at £75.00 per tonne = 2 * £75.00 = £150.00
20 bags of cement at £6.70 per bag = 20 * £6.70 = £134.00
350 bricks at 45p each = 350 * £0.45 = £157.50
Therefore, the total cost of all the materials = £150 + £134 + £157.5 = £441.50
V=πr2h
v=π(5)^2(10)
v=250π
v=785 inches cubed
Answer: Rotating a shape 90 degrees is the same as rotating it 270 degrees clockwise.
Step-by-step explanation:
Answer:
It's D or 1/7^2

Step-by-step explanation:
They both equal 1/49