Answer:
2.2N
Explanation:
Given parameters:
Work done = 379.5J
Height = 173m
Unknown:
Amount of force exerted on the sled = ?
Solution:
The amount of force she exerted on the sled is the same as her weight.
Work done is the force applied to move a body through a distance.
Work done = mgh
m is the mass
g is the acceleration due to gravity
h is the height
mg = weight;
Work done = weight x h
379.5 = weight x 173
weight =
= 2.2N
the cycle of processes by which water circulates between the earth's oceans, atmosphere and land involving precipitation as rain and snow drainage in streams and rivers and return to the atmosphere by evaporation and transpiration.
Hope this gives you a little bit more information!
Explanation:
Given that,
Mass if the rock, m = 1 kg
It is suspended from the tip of a horizontal meter stick at the 0-cm mark so that the meter stick barely balances like a seesaw when its fulcrum is at the 12.5-cm mark.
We need to find the mass of the meter stick. The force acting by the stone is
F = 1 × 9.8 = 9.8 N
Let W be the weight of the meter stick. If the net torque is zero on the stick then the stick does not move and it remains in equilibrium condition. So, taking torque about the pivot.

W = 3.266 N
The mass of the meters stick is :

So, the mass of the meter stick is 0.333 kg.
The reaction of reduction always undergoes with the cathode, the positive ion will migrate towards the cathode with the negative charge whilst the anode always has oxidation reaction. These two types of reaction does not change.