Answer:
That a DVI connector looks different and that it support more monitors.
Explanation:
Answer:
I think make a copy maybe
Explanation:
Answer:
The answer is "auditors"
Explanation:
Description to this question can be described as follows:
- Auditors are professionals who analyze business and corporate accounts to determine, that the financial reports are accurate and lawful. It will serve as a consultant to suggest possible measures for risk avoidance or cost reduction.
- Data security is the mechanism to avoid theft, loss of sensitive information, and information quality is critical and it is not able to know or stay in contact with your clients without high-quality data, that's why auditors are the correct answer and other choices can't be defined in the following senior.
Wouldn't it Be Stem ?
Science
technology
Engineering
Mathmatics
Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.