Answer:
- 1 1/14 seconds
- 4 2/7 seconds
Step-by-step explanation:
We are being asked for times, so we can express the rate in terms of seconds per meter.
(15 seconds)/(14 meters) = (15/14) seconds per meter = 1 1/14 seconds/meter
__
1) It will take Robot A 1 1/14 seconds to go 1 meter.
2) it will take Robot A 4 2/7 seconds to go 4 meters. (4 times as long)
Answer:
x>-2
Step-by-step explanation:
first you want to get rid of all of the numbers on the left so you can only be left with 2x>-4 then you decide both sides by 2x because you only want to be left with one x and once you divide you will be left with x>-2
Answer:
He would at least made $18.95 dollars per hour
Step-by-step explanation:
You first have to multiply 36.50 to 35, you would get 1137.5. Since the question ask how many he earn each HOUR, you have to divide it 60, which you get 18.95 and other decimal. If it wrong, I'm sorry. I tried my best.
Answer:
C
Step-by-step explanation:
A linear function is the repeating of the same word. Therefore, C would be the correct option. Due to the order 3 9 3 9, this is a linear function. This is just the most logical answer. Please let me know if I am wrong. Sorry if I am :(
The expression can represent the value of x in terms of R, m, n and k after rearranging.
<h3>What is an expression?</h3>
It is defined as the combination of constants and variables with mathematical operators.
It is given that:
The expression is:

Square both side:

16m² x n = R²k³
x = (R²k³)/(16m²n)
The above expression represents the value of x in terms of R, m, n and k.
Thus, the expression can represent the value of x in terms of R, m, n and k after rearranging.
Learn more about the expression here:
brainly.com/question/14083225
#SPJ1