Answer:
Step-by-step explanation:
(-1/8)/(-1/3) = (-1/8)×(3/-1) = (-1)(3)/(8)(-1) = -3/-8 = 3/8
gives an average cost per unit, if we want to produce x of them.
So for example, we want to produce 500 toy cars for our store, and we need a price per unit (per 1 toy car). What we do is we calculate C(500).
So to calculate the cost of one unit when producing 1250, we calculate C(1250)

$ is the cost of 1 toy car.
Answer
Answer:
1.649 approximately 2
Step-by-step explanation:
S.d = standard deviation = 0.5
Time taken = lead time = 2 weeks
Mean = demand for week = 5 boxes
We are required to find the safety stock to maintain at 99% service level.
At 99% level, the Z value is equal to 2.326.
Therefore,
Safety stock = z × s.d × √Lt
= 2.326 × 0.5 x √2
= 1.649
Which is approximately 2.