Answer:
Predetermined overhead rate=$19.5/machine hour
The company applied $877500 to the units produced.
Explanation:
a) Pre-determined overhead rate= <u>Budgeted overhead manufacturing cost</u>
Estimated number of machine hours
=975000/50000=$19.5/machine hour.
b)Applied overhead = Pre-determined overhead rate * Actual machine hours
= 19.5 * 45000
=$877500.
c.
In traditional costing we use as base for calculating overhead rate is machine hours or labor hours but in activity based costing we identify activity that consume resources,identify cost driver of each activity,compute cost rate per cost driver unit and finally assign cost to products by multiplying cost driver rate.
Predetermined overhead rate= estimated overhead/Estimated base (cost driver).
Answer:
stimulation ; stabilization
Explanation:
Automatic stabilizers act to stimulate the economy during recessions and stabilize the economy when it becomes overheated
The answer is b or a but I mean it both means the same thing, if this is on Plato it's a
Answer:
The factory overhead allocated per unit of Product A in the Painting Department = 7 * 15.623= $ 109.37
Plantwide Overhead Rate= $328,100 /21000= 15.623
Explanation:
Overhead Total Direct Labor Hours DLH per Product A B
Painting Dept. $245,600 9,50 7 7
Finishing Dept. 82,500 1 1,500 3 4
Totals $328,100 21,000 10 11
Plantwide Overhead Rate= Total Manufacturing Overhead/ Direct Labor Hours
Plantwide Overhead Rate= $328,100 /21000= 15.623
The factory overhead allocated per unit of Product A in the Painting Department = 7 * 15.623= $ 109.37
Answer:
The correct answer is letter "C": You are usually not in charge.
Explanation:
Wage-earners are the people who live mainly thanks to the salary they receive. Under this category fall low-range workers whose base income is their source of income. Hardly ever low-range employees are assigned major tasks since they are subordinates, so the success or failure of a project does not rely directly on them since they are not the ones in charge.