Multiply the sales by the commission rate and add that to the base salary.
45,000 x 0.04 = 1,800
Total pay = 1800 + 380 = $2,180
600km??? Because it’s travelling 600km and hour so it’s average is 600km and hour
This is an approximately bell-shaped distribution. The highest bar is in the center, with height = 12. Just to its left and right are bars of heights 6 and 5. At the extremes are bars of heights 2 and 1.
If the highest bar was on the left, it would be skewed left (and if it was on the right, skewed right). A uniform distribution would more or less have the same height level over all the bars.
First join the log4 on the left:
log4( x*(x-3) = log4(-7x+21)
Then x = -7, works: -7*(-10)=70 = -7*(-7)+21
x=-3, 18 = 42, does not work
x=3 0=0 works,
However, when one puts x = -7 in the *original* exression, log4(-7) or log4(-10) do not exist (you know why?). So x= -7 is extraneous.
Now x=3 gives log4(0) on the left and right, which does not exist.
So, C is the answer, both are extraneous. Seem to work but indeed don't work in the *original* equation
If there are 3 red blocks for every 5 blocks
if we multiple both numbers by 12 to make every 60 blocks we get:
36 red blocks every 60 blocks
since you have 36 and you only need 32 then yes you will have enough