Answer:
i think 3/5 but not 100%
Step-by-step explanation:
sorry if im wrong
Answer:
The answer is below
Step-by-step explanation:
a) Cost of hiring the bicycle for 14 days is:
Cost = 65 * 14 days + 44 = 954 riyals
b) The number of days the bicycle is hired is to be the same as the number of days the bicycle is to be hired. Let us assume that the bicycle and helmet is to be hired for x days, hence:
Cost of bicycle = 65 * x + 14 = 65x + 44
Cost of helmet = 12.5 * x = 12.5x
Total cost = 65x + 44 + 12.5x = 77.5x + 44
Since 750 riyals is available, hence:
750 = 77.5x + 44
77.5x = 706
x = 9.11
Therefore the maximum number of days is 11. The total cost for 11 days is:
Total cost = 77.5(9) + 44 = 741.5 riyals
Money not spent = 750 riyals - 741.5 riyals = 8.5 riyals
Answer:
A
Step-by-step explanation:
Hopefully this helps
51 x3 is 153 is 153 x 12 is 22032
Answer:
Ask: To check and make sure your answer is correct
Share: Subtracting a number is the same as adding its opposite. So, subtracting a positive number is like adding a negative; you move to the left on the number line. Subtracting a negative number is like adding a positive; you move to the right on the number line.
Step-by-step explanation: