Answer:
The answer is CD, just had the same question myself.
Bromine has 7 electrons in their valence shell.......
Answer:
water leak is 650 gallons
time required to full drain is 80 hrs
Explanation:
given data
volume V = 3200 gallon
rate = V(t) = 80 - t
to find out
how much water leak between 10 and 20 hour and drain complete
solution
we know here rate is 80 - t
so here rate will be
= 80 - t
and for time 10 and 20 hour
take integrate between 10 and 20
so water leak =
.....................1
water leak = ( 80t - 
water leak = 650
so water leak is 650 gallons
and
we know here for full tank drain condition
water leak full = 80 t - 
3200 = 80 t - 
6400 = t² - 160 t
t = 80
so time required to full drain is 80 hrs
<u>Answer</u>
a. tension (associated with normal faults)
c. diagonal
<u>Explanation</u>
A pull of spring or of string on both ends of an object is called tension. So for the question one, the answer is <em> tension (associated with normal faults)</em>
There are three types of faults. Faults are produced by stress or strain by moving plates. These faults are: normal faults, reverse faults and transcurrent or Strike-slip. Strike-slip faults can also be called transform fault. The answer to the second question is <em>c. diagonal.</em>
The correct answer is: 1792g or 1800g.
(When you round it)