Answer:
It means that the project is in good shape, within budget an d it would finish early
Step-by-step explanation:
The answer to this question is pretty straight forward. If a project has the percent spent fine 90 percent, the scheduled has percentage of 85 percent and the complete is at the percentage of 95, what it means is that this project is in good shape, the project being carried out is still being done within the proposed budget and at 95% complete, it means that the project is going to finish early.
There seems to be a flaw with this question because it says that there are five x-intercepts but the given information only gives you 4 x-intercepts to work with.
Even means the graph is symmetric about the y-axis
The best answer is <span>A.(–6, 0), (–2, 0), and (0, 0)
because you do not have to worry about another point (0,0). Plus we need (-6,0) for it to be symmetric with (6,0).
Consider function f(x) = x²(x-6)(x+6)(x+2)</span>²(x-2)<span>². It is even and fits these conditions as it has x-intercepts at (6,0), (-6,0), (-2,0), (2,0), and (0,0). again, the question does not tell us the fifth x-intercept, so we need to assume that there is another one that needs to be there...and so (-2,0) must have (2,0) for it to be even as well.</span>
Answer:
11
Step-by-step explanation:
Answer:
<4 = 22
Step-by-step explanation:
<4 = x
x + 158 = 180
x = 22
the only thing you need to do is separate m:
2/7m= 3/14 + 1/7
2/7m= 5/14
m= (5/14)/(2/7)
m= 5/14 × 7/2
m= 35/28
m= 5/4