1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
MAVERICK [17]
3 years ago
9

Pls help me you guys are amazing :)

Mathematics
1 answer:
dezoksy [38]3 years ago
7 0
11.68 is the right answer. I am not totally sure. All I did was mulitply 4.25 (4 1/2) and 2.75 (2 2/3) to get that answer. Try it and see if you get the same answer. 
You might be interested in
Find me midpoint of -9 and 6
Ymorist [56]
The answer I believe is -2. Thank you come again
4 0
3 years ago
Read 2 more answers
Determine the utilization and the efficiency for each situations:A. A loan processing operation that processes an average of 7 l
Vera_Pavlovna [14]

Answer:

A) Utilization = 70%

Efficiency = 87.5%

B) Utilization = 66.67%

Efficiency = 80%

Step-by-step explanation:

Determine the utilization and the efficiency for each situations:

A. A loan processing operation that processes an average of 7 loans per day. The operation has a design capacity of 10 loans per day and an effective capacity of 8 loans per day.

Formula for Utilization = Actual Output /

Design Capacity × 100

Actual output = 7 loans per day

Design capacity = 10 loans per day

Utilization = 7/10 × 100

= 70%

Efficiency = Actual output / Effective capacity × 100

Actual output = 7 loans per day

Effective capacity = 8 loans per day

Efficiency = 7/8 × 100

= 87.5%

B. A furnace repair team that services and average of four furnaces a day if the design capacity is six furnaces a day and the effective capacity is five furnaces a day.

Formula for Utilization = Actual Output /

Design Capacity × 100

Actual output = four furnaces a day

Design capacity = six furnaces a day

Utilization = 4/6 × 100

= 66.67%

Efficiency = Actual output / Effective capacity × 100

Actual output = four furnaces a day

Effective capacity = five furnaces a day

Efficiency = 4/5 × 100

= 80%

6 0
3 years ago
Plz help me with this.
oee [108]

Answer:

Step-by-step explanation:

7 0
3 years ago
Read 2 more answers
Please help me find the slope
hjlf

Answer:

the slope is 2

Step-by-step explanation:

rise/run 4 rise run 2 simply and you get just 2

8 0
3 years ago
Read 2 more answers
1. is a hanger a/an right,acute, or obtuse triangle?
goldfiish [28.3K]

Answer:

1. acute 2. isosceles

Step-by-step explanation:

1. Acute means less then a 90 degree angle a hanger has a degree of about 60.

2. isosceles means it has 2 sides the same length a hanger has 2 sides the same length.

7 0
3 years ago
Other questions:
  • Jack has 12 pencils and 7 pens.how many more pencils than pens does he have
    9·2 answers
  • Why is this app so bad
    12·2 answers
  • Larry graphs the inequality x less-than negative 5 using the steps below. Step 1: Draw a number line, and place an open circle a
    13·2 answers
  • Use Lagrange multipliers to find the volume of the largest rectangular box in the first octant with three faces in the coordinat
    12·1 answer
  • How many faces,edges and vertices does the three-dimensional figure have?
    5·1 answer
  • Solve for x<br> 6(2x + 1) = 18
    5·2 answers
  • A student is conducting a research project that involves using a survey. The survey asks subjects about their political affiliat
    7·1 answer
  • Select the expression that has a sum of 75/100
    11·1 answer
  • PLEASE HELPPPPPP, I'LL GIVE BRIANLEST​
    6·2 answers
  • Please help me with this
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!