It is B. and now i have to type more to get this answer posted
Answer:
human side to computer side
Explanation:
Automation of a process activity consists of moving work from the human side to computer side of the symmetrical five-component framework.
Answer:
Quality is the perhaps the most desired thing in a good or service, however, sometimes, as customers, we have to compromise on quality for a cheaper price.
Personally, I look for quality when I buy a laptop. I have had four laptos in my life. Two of those laptops were HP, and the two other were Lenovo.
I had a good experience with my first HP laptop, so I bought another one years later. That second HP had many technical issues only a few months after the purchase, and a year later I ended up buyina new Lenovo laptop.
That first Lenovo lasted for over 4 years until I replaced it for a new one.
In this case, the lack of quality I have personally experienced with HP has made me ditch the brand altogether.
Answer:
Explanation:
There are primarily two types of costs, i.e. variable costs and the fixed costs. The variable cost is the cost which changes when the level of production changes, whereas the fixed cost is the cost which remains constant whether the level of output changes or not.
The variable costs also include indirect products, indirect labor and manufacturing equipment, and the fixed costs include taxes and depreciation costs.
The period cost is that cost which is related to the selling and admin expenses plus it is not capitalized.
Whereas the product cost is a mix of direct labor, direct material and the manufacturing overhead
So, the categorization is shown below:
1. Hamburger buns in a Wendy's outlet. = variable and product cost
2. Advertising by a dental office. = Fixed and period cost
3. Apples processed and canned by Del Monte. = variable and product cost
4. Shipping canned apples from a Del Monte plant to customers. = variable and period cost
5. Insurance on a Bausch & Lomb factory producing contact lenses. = fixed and product cost
6. Insurance on IBM's corporate headquarters.= fixed and period cost