Answer:
Step-by-step explanation:
Interest formula -
I = P × R × T
I = 3,280 × 0.3% × 9
What I basically did there wws multiply the amount of money, the simple interest, and the time.
Turn 0.3% into a decimal by dividing by a 100 which should give you 0.003
I = 3,280 × 0.003 × 9
Put that into a calculator, you get $88.56
Now, that's just the interest amount. Now you add it back to 3,280 to get the *total* amount.
3,280 + 88.56 = 3,368.56
Cathy ends us paying $3,368.56
Hope what I said made sense.
Answer: f=-2
Step-by-step explanation:
math
Please read the attached file
Answer:
(0,1)
Step-by-step explanation:
The mid point of A(-2,2) and B(2,-4) is the coordinates of point P, which is (x,y)
Hence, the line AB = AP + PB.
At point AP: x = (-2+2)/2 = 0
also, point PB: y = (2 - 4)/2 = -1
Therefore, coordinates of point P = (0,-1)
Answer:
No
Step-by-step explanation:
From the information provided, we can say that he is not correct. This is because the depth of the water is the only measurement that he is using to make his estimate. Comparing the depth of the aquarium and the bucket is one measurement, but both the aquarium and bucket are most likely of different shapes and sizes. Therefore, this equates to more buckets for the same amount of depth in the aquarium. To get a proper estimate on how long it will take he needs to calculate the volume of water in the bucket and compare it to the volume of water needed to fill the aquarium.