Answer:
No answer
Step-by-step explanation:
5x-20-X+9
7x-20+9
7x-11
Since 470/6 = 78.333 it would take you 78.333 days to work 470 hours.
Answer: 6*x*y
Step-by-step explanation:
u have to do 2*3 first
Answer:
NO amount of hour passed between two consecutive times when the water in the tank is at its maximum height
Step-by-step explanation:
Given the water tank level modelled by the function h(t)=8cos(pi t /7)+11.5. At maximum height, the velocity of the water tank is zero
Velocity is the change in distance with respect to time.
V = {d(h(t)}/dt = -8π/7sin(πt/7)
At maximum height, -8π/7sin(πt/7) = 0
-Sin(πt/7) = 0
sin(πt/7) = 0
Taking the arcsin of both sides
arcsin(sin(πt/7)) = arcsin0
πt/7 = 0
t = 0
This shows that NO hour passed between two consecutive times when the water in the tank is at its maximum height