Answer:
60 students passed, and 75 appeared in examination.
Step-by-step explanation:
Let's say s is the total number of students and p is the number of students who passed.
80% of the students passed, so:
0.8 s = p
If there were 10 less passers, and 15 less students (5 less failures), then the ratio of passers to failures would be 5/1.
(p − 10) / (s − p − 5) = 5 / 1
Simplify the second equation:
p − 10 = 5 (s − p − 5)
p − 10 = 5s − 5p − 25
6p = 5s − 15
Substitute the first equation.
6 (0.8 s) = 5s − 15
4.8 s = 5s − 15
0.2 s = 15
s = 75
p = 0.8 s
p = 60
60 students passed, and 75 appeared in examination.
Let's look at work rates per minute.
Together they can paint the wall in x minutes.
Working together, in 1 minute, they do 1/x of the job.
The student who paints the wall in 16 minutes does 1/16 of the job in 1 minute.
The student who paints the wall in 24 minutes does 1/24 of the job in 1 minute.
Together, they do 1/16 + 1/24 of the job in 1 minute, but from above, we see that together, they do 1/x of the job in 1 minute, so 1/16 + 1/24 must equal 1/x. That gives us our equation.
1/16 + 1/24 = 1/x
1/16 * 3/3 + 1/24 * 2/2 = 1/x
3/48 + 2/48 = 1/x
5/48 = 1/x
x = 48/5 = 9.6
Answer: It takes them 9.6 minutes, or about 10 minutes to do the job together.
Answer:
b both pairs of opposite sides are parallel
Answer:
There are 96 ways different 4 digit numbers which can be made from these 5 digits.
Step-by-step explanation:
There are 5 different digits. The first one must be
1 3 5 or 7
So you can have 4 for the first one. Now the zero can be put into the mix.
4 * 4 * 3 * 2
96
Answer: The answer is P'(7, 17.5) and Q'(7, 3.5).
Step-by-step explanation: Given that a line segment PQ is dilated with a scale factor of 3.5 where origin is the centre of dilation.
The end points of segment PQ are P(2, 5) and Q(2, 1).
Therefore, after dilation, the coordinates of the end points become
Thus, the coordinates of P' are (7, 17.5) and the co-ordinates of Q' are (7, 3.5).